Showing posts with label MPA. Show all posts
Showing posts with label MPA. Show all posts

Malaysia to order CN-235 maritime patrol aircraft from Indonesia

Malaysia to order CN-235 maritime patrol aircraft from Indonesia
By Leithen FrancisAerospace CN-235 maritime patrol aircraft.

Air force officials, including chief of staff Rodzali bin Daud, have been negotiating with Indonesia's state-owned aircraft-maker PT Dirgantara Indonesia for the purchase, say industry sources.

The two sides hope to sign a letter of intent at the Defence Services Asia show in Kuala Lumpur in late April, they add.

Malaysia needs maritime patrol aircraft because its air force has been relying largely on four Beechcraft Super King Airs that it received in 1994. One of these was recently upgraded with a Thales radar and a second is to undergo the same work in the coming months.

The air force wants the CN-235MPAs to widen its operations and improve payload performance, say industry sources. The service already operates CN-235 transports, so Indonesia's offering provides some fleet commonality.

Malaysia has considered other types, such as a version of the Fokker 50. Fokker Services Asia had pushed the model as a cheaper alternative, and made a proposal to have some commercial Fokker 50s recently phased out by Malaysia Airlines converted for the maritime patrol mission by national maintenance, repair and overhaul firm Airod. Malaysian government investment firm Penerbangan Malaysia Berhad owns the retired aircraft.

Links posted in this story:


Indonesia will build their own MPAs


BANDUNG, KOMPAS.com - PT Dirgantara Indonesia (DI) hoping to get an advance for the procurement of three aircraft CN235-220 in three months. The total value of contract aircraft orders the Department of Defense (DoD) was for 80 million U.S. dollars.

PT DI president director, Budi Santoso in Bandung, Monday (14/12/2009), say, expected advances for 15 to 20 percent of the value of contract last week with Director General of Defense Facilities (Ranahan) Department of Defense, Air Vice Marshall Eris Herryanto.
Down payment is required because PT DI also had to order the aircraft components that need funding. Meanwhile, parts of aircraft such as radar or engine must be made first. Making machines for example, took about 18 months.

"I hope the prime delivery CN235-220 aircraft can we meet in 24 months since the contract was signed," said Budi.
Aircraft making funds came from export credits. Government borrowing from foreign banks to be distributed to PT DI.
source :www.kompas.com